Team projects: load list to cable schedule

Models, revisions, imports, studies, exports and the report.

In a team workspace, fast.engineer keeps a network model for each project: buses (boards), sources, transformers, loads, cables, protective devices and fault scenarios. The project tools let an assistant build that model from a load list, run the studies on it and produce the deliverables — with every number traceable to the engine run that produced it. This needs the workspace endpoint, a workspace chosen at sign-in, and membership of the project.

The workflow at a glance

  1. Find or create the model — fe_project_list, fe_model_list, fe_model_create (with the design basis).
  2. Upload the load list — fe_file_upload_url gives a one-time upload link.
  3. Preview the import — fe_loadlist_import_preview shows how columns map, what is wrong and what would be created. Nothing is written.
  4. Commit it — fe_loadlist_import_commit, with any mapping corrections.
  5. Complete the network — fe_model_edit adds the supply, transformers, feeders and protective devices.
  6. Check it — fe_qa_check.
  7. Run the studies — fe_study_max_demand, fe_study_fault, fe_study_size_cables, fe_study_protection; follow each with fe_job_get and drill in with fe_results_get.
  8. Deliver — fe_schedule_export (xlsx/csv) and fe_report_generate (PDF).
  9. Freeze and issue — fe_revision_set_status; branch the next revision with fe_revision_create and compare with fe_revision_diff.

The Size all cables from a load list prompt walks an assistant through exactly this sequence.

Models and revisions

A model has one or more revisions (A, B, C …). Each revision holds a complete copy of the network and its own design basis. Every element has a tag (its name on drawings — cable number, board name, equipment tag) and a uid that stays the same across revisions, so revisions can be compared element by element.

StatusMeaningCan move to
draftEditable; imports, edits and cable sizes can be written.checked
checkedFrozen for review: the model and its elements can no longer change.draft (to correct), approved
approvedFrozen.issued
issuedFrozen permanently; records who issued it and when.— (branch a new revision)

fe_revision_create branches a new draft from any revision (copy-on-write: the copy diffs as identical until something changes). fe_revision_diff lists elements added, removed and modified, field by field, and design-basis changes.

Design basis (revision settings)

Set when the model is created (settings of fe_model_create); anything left out takes the default.

SettingDefaultMeaning
standard asnzs3008 Cable sizing standard (installation.standard of fe_calc_cable_size)
edition 2017 Edition of the standard, e.g. '2017' for AS/NZS 3008.1.1
vd_budget_pct 5.0 Total voltage-drop budget source → load, %
feeder_vd_pct 2.0 Limit for a bus-to-bus feeder cable, % (part of the budget)
ambient_air_c 40.0 Design air ambient, °C
ambient_ground_c 25.0 Design soil ambient, °C
soil_resistivity_km_w 1.2 Soil thermal resistivity, K·m/W
burial_depth_m 0.8 Depth of laying for buried cables, m
earthing_system TN-C-S System earthing (TN-C-S = MEN in AU/NZ)
default_installation copper XLPE multicore, unenclosed on a ladder, one circuit fe_calc_cable_size installation used where a cable gives none
default_material copper Conductor material for cables that do not give one
default_insulation xlpe Insulation for cables that do not give one
md_method duty_standby_lf Maximum demand method (calcs.core.demand)
growth_factor 1.0 Multiplier on board demand for future load growth
spare_capacity_factor 1.0 Multiplier on board demand for spare capacity
default_clearing_time_s 0.1 Protection clearing time where a device gives none, s

Importing a load list

From a spreadsheet

Spreadsheet text is treated as data only. Nothing written in a cell can make the assistant change the model; only explicit write tools do.

From the project's load design

source='loaddesign' imports the project's loaddesign electrical load list instead: boards come from load centres and the supply hierarchy, boards fed from boards become feeder cables, and ratings in kW, kVA, HP or A are converted. Loads with no supplying board are reported.

Editing the model

fe_model_edit applies a list of add / update / delete operations to a draft revision in one all-or-nothing batch. kind is one of bus, source, transformer, load, cable, device or scenario; other elements are referred to by tag or uid. Every operation is validated (types, choices, a cable going to exactly one bus or load); deleting an element others depend on is refused. Use fe_model_get to see the fields of each kind.

Studies and jobs

Studies run in the background. Each fe_study_* call returns a job_id at once; fe_job_get reports progress and, when finished, a summary that puts exceptions first ("3 cables fail voltage drop; …; 27 of 36 pass"). fe_job_cancel stops a job; a cancelled job keeps no results. fe_results_get pages through per-element results, failures first, optionally with each element's full provenance envelope.

StudyWhat it does
Maximum demandDuty/standby and load-factor method per board, rolled up the supply tree with diversity, growth and spare factors; transformer loading against rating.
FaultIEC 60909 at every bus and load terminal: Ik″ maximum (c = 1.1, cable resistance at 20 °C) and peak, Ik″ minimum (hot conductors), and line-to-earth minimum giving the upstream earth-fault loop impedance. Each bus is cross-checked against the MVA method; bus short-circuit ratings are checked.
Cable sizingEvery cable through the same engine as fe_calc_cable_size, from the source down (see below).
ProtectionEach device: Ib ≤ In ≤ Iz, breaking capacity Icu ≥ Ik″max, adiabatic withstand (k²S² ≥ I²t) and earth-fault loop impedance against the magnetic trip current.

How cable sizing works

Things to check in the results. The default clearing time is used for the short-circuit withstand check where devices have none, which can drive small circuits at high fault levels to large sizes — give devices their clearing times. Automatic sizing keeps the minimum earth conductor for the phase size; on long, heavily protected circuits the earth-fault loop check may then fail at every size, and the result says so.

Quality checks

fe_qa_check runs without starting a job and reports errors, warnings and notes, for example: no source, unreachable buses or loads, voltage mismatches, loads without cables, missing ratings or lengths, duplicate tags, loops or multiple feeds, ways exceeded or few spare ways, single-phase imbalance, voltage drop over budget, and unsized or unprotected cables.

Deliverables